Water / Cement Ratio is to be selected from the is 10262 as per the Design Mix,
Also we can calculate the water cement ratio by Thumb rule
a) 28% wt of cement + 5% wt of aggregate
as for hydration of Cement 28% water is required by weight and 5 % extra is added to compensate for wetting of coarse aggregate
Is This Answer Correct ? | 0 Yes | 2 No |
Answer / toto1704
Thumb rule:
Water required = 28% wt. of cement + 4% wt. of aggregate
Water required = 30% wt. of cement + 5% wt. of aggregate
Is This Answer Correct ? | 4 Yes | 8 No |
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
for plaster what is the suitable sand.
what is the meaning or full form of 12T13 cables used in prestressed bridges
what is procedure to find the volume of material in M20 concrete?
why construction joint in the slab should be l/3 of span? what's the technical reason for that?
what is mant by point of conter of fracher(p.c.f)
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
Minimum sizes of beam and coloumn
what is formwork in construction
calculate qty of sand in 15 mm plaster for 100 sqm.
What is the stripping time of shuttering for PPC concrete