How to calculate the water content cement ratio..

Answer / piyush singh

Water / Cement Ratio is to be selected from the is 10262 as per the Design Mix,

Also we can calculate the water cement ratio by Thumb rule

a) 28% wt of cement + 5% wt of aggregate

as for hydration of Cement 28% water is required by weight and 5 % extra is added to compensate for wetting of coarse aggregate

Is This Answer Correct ?    0 Yes 2 No

How to calculate the water content cement ratio..

Answer / abiraj07

EXP:
 50Kg cement x 0.50 =27.5 litrs

Is This Answer Correct ?    4 Yes 7 No

How to calculate the water content cement ratio..

Answer / toto1704

Thumb rule:
Water required = 28% wt. of cement + 4% wt. of aggregate
Water required = 30% wt. of cement + 5% wt. of aggregate

Is This Answer Correct ?    4 Yes 8 No

Post New Answer

More Civil Engineering Interview Questions

do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?

0 Answers  


Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?

1 Answers  


for plaster what is the suitable sand.

3 Answers  


what is the meaning or full form of 12T13 cables used in prestressed bridges

1 Answers  


what is procedure to find the volume of material in M20 concrete?

6 Answers  






why construction joint in the slab should be l/3 of span? what's the technical reason for that?

1 Answers  


what is mant by point of conter of fracher(p.c.f)

6 Answers   TCS,


Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem

0 Answers  


Minimum sizes of beam and coloumn

2 Answers   bscpl,


what is formwork in construction

4 Answers  


calculate qty of sand in 15 mm plaster for 100 sqm.

5 Answers   NHPC, Vellapally,


What is the stripping time of shuttering for PPC concrete

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)