what is grade intersection?
No Answer is Posted For this Question
Be the First to Post Answer
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
how much cost of single coat 20mm thick plastering per sqre meter
if L*B*H = 20 then direct no of bricks =20 *500
What will be weight of 0.5mm GI sheet per sq.ft?
what is the formula of calculating number of bars?
what is the name of software for designing of R.C.C.structures
how much cement sand n bricks required in im3?and how much in plaster?
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
what"s the formula find the cement consumption for brick work 23 thick wall 1 m3?
7 Answers L&T, Vipul Chemicals,
Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....
Which is stronger solid steel rod or hollow steel pipe?
why we use 19x9x9and 20x10x10 but not other
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)