Answer / sjtbehera
As per IS458-1988
NP2 is RCC hume pipe for light weight traffic
NP3 is rcc hume pipe for medium duty traffic
| Is This Answer Correct ? | 6 Yes | 0 No |
Answer / mkg
np2 pipe withstand 4kg/cm2 pressure
np3 pipe 6kg/cm2
| Is This Answer Correct ? | 0 Yes | 0 No |
In Rcc ratio calculation I wanted to know quantity of Steel also.
How will you reduce the concrete flow after mixing the concrete
Define Finite element method (FEM)
cement and sand required for one block of size 0.23*0.15*0.46
what is drainage system?
how much should we assume for the weight of foundation ??
In interview,if they ask what are your achievements in your career?how to answer this question?
2 Answers GMR, Taehwa Enterprises,
Method of findingthe dry ingredient quantity of 1 m3 concrete.
25 Answers Annai Infra Developers, GKC Projects Limited GKCPL, IRE, L&T, Mahle Filter Systems, NCC, PNRD, Rama, RCC, Shivani Agriculture, Sobha Developers, Suraj Constructions, TCL,
how will i find leakage in underground?
Is 456 revised lastly in which year? & What are the revisions?
What is the use of offset command?
Q1) I am having an interview in a construction company for a large sewage project . Since I have not done any such project , there are some queries from my end. Pls. help me to solve them. I will be thankful to you :- a) Normally for large project 400-600 houses & around 1600 peoples , how much dia pipe is used and which type of pipe is used? b) For trenching , I have heard that IS 1200 implies, what are the rules of calculating earthwork in case of depth of 2m or above ? c) To prevent soil to fall when depth of trench is more , what steps are taken and how there qty. is calculated . Like I have heard about timbering . what is this ? d) What are the rules for disposing off the excavated soil ? e) How the pipes that are used are being jointed? f) In case of cleaning on choks , is there any intermediate things provided? g) For foul gases any outlets are provided thru out length of pipeline? h) What is the flow digram like from houses thru small pipe to main pipeline than where main pipeline disposes wastage ? i) Any other thing that has to be kept in mind while calculating earth work for excavation like steps are made and other things? How earthwork is calculated in case of steps ? Pls. explain with a sketch. Regards,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)