Answer / maria alphonse pandian
This question is not clear whether the shuttering is for coloumn or slab or beam as it is variable structure to structure.
| Is This Answer Correct ? | 1 Yes | 0 No |
what is the number of cement bags (50 KG) required for concreting 1000 Square Feet Slab . Thickness of slab 4 inch.
4 Answers Gammon, LNN, Ramky, TATA,
what is the development length?
what do you mean by fe500d what is 500 n what's ,d,
Dfine superelevation.it depends upon which of the following. 1.surface condition of road 2.width of road 3.radius of curve 4.speed of vehicle
how the take measurement at column and beam junction
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
How much does it cost for a R.C.C roof slab of size (25 X 20) given in feets using 1:2:4 concrete mix of M20?
What are the main reasons for conducting pull-out tests for soil nails?
22. Are you willing to attend trainings, learn new skills and develop as a professional?
what will be the grade of concrete for PCC having ratio 1:4:8?
difference between tmt and tor steel
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)