Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how many shuttering material required for 100 sqm



how many shuttering material required for 100 sqm..

Answer / maria alphonse pandian

This question is not clear whether the shuttering is for coloumn or slab or beam as it is variable structure to structure.

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

1) what is the use of pin and plate vibrators during slab casting? 2) how much cement bags are required for 1sqm 4inch brick wall? 3) Is it viable to provide overlap at column , beam & slab junction. if no why? 4) if bar dia is changing in column reinforcement , which dia bars overlap is considered? 5) what is isolated and ecentric footing?

4 Answers  


What the approval that owner will give to contractor during construction project period? What will the affect on project if delays due approvals?

2 Answers  


how many bricks are required for masonary trench having length of 31 mtr, depth of 0.6 mtr and breadth of 0.45 mtr on single brick work as well as double ( 9" ) brick work

5 Answers   IEC,


sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????

0 Answers   L&T,


Advantages and Disadvantages of using fly ash bricks over clay bricks?

11 Answers   Pradhi Engineering,


What things you need to take care of before building a kitchen island?

0 Answers  


How to find CN by using arcgis 9.3?

0 Answers  


what is the list of building construction equipment & teir output?

0 Answers  


how can we determine the quantity of steel bars in a structure? is there any formula for determing the number of bars required ?

3 Answers   Nespak,


How to calculate the compressive strength of 28 days of concrete where we have 7 days compressive strength?

2 Answers   ACF,


how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?

0 Answers  


how much steel and concrete required for 450 sft slab? tell also the method

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)