Answer Posted / arvindrai
1))By providing temperature bars in concreting section
2)) Providing of Ice pieces at time of mixing
| Is This Answer Correct ? | 8 Yes | 2 No |
Post New Answer View All Answers
What is thumb rule for deep trench excavation
What is different between DI Pipe and CI pipe?
Floor tile measurement? Wall to wall or skirting to skirting
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial
what is the types of surveying?which type of survey carrying for type of work?
What is meant by a context menu in a cad software?
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
how to calculate the steel in 500yard
what is education Cess.
What is the maximum strength of cub compress strength in one cub testing
Explain how you can turn off the display for dimension in CAD?
Which condition will prevail for the design of a swimming pool ? When the pool is empty or when it is filled ?