Answer Posted / arvindrai
1))By providing temperature bars in concreting section
2)) Providing of Ice pieces at time of mixing
| Is This Answer Correct ? | 8 Yes | 2 No |
Post New Answer View All Answers
wat would be the probable interview questions and GD topics for IOCL exam?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
Tell me about triple point of water.
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
how lap length is increased with increase of Grade of steel?
01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.
Why should pumping be not used in case of concreting work?
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
Can we apply curing compound on ceiling (slab Bottom)
what"s the sort of beams?
what is the ingredient value of 40mm and 20mm aggregates?
How to hide dimensions in autocad?