extra how much quantity need to fill the actual excavated
quantity.
Answers were Sorted based on User's Feedback
Answer / nadim shaikh
depends upon the material by which the filling is needed
| Is This Answer Correct ? | 0 Yes | 0 No |
backfilling is 1/3 rd of the excavated qnty.
| Is This Answer Correct ? | 0 Yes | 2 No |
Answer / sjtbehera
actual excavated qty minus RCC qty plus PCC qty of the
structure.
| Is This Answer Correct ? | 1 Yes | 5 No |
a revised estimate is prepared when the original estimate has exceed by more than 1 percent 2 10 18.40
can you give me the details of rate analysis of steel and concrete?
how many moisture content in well seasoned timber
How many required water of 1m3 Brick masonary and slab casting?
1 Answers Everest Bank, GVR, Vijay Nirman Company Pvt Ltd (VNC),
Where are u provide laps in columns & beams?
what is Brest Wall?
What are the disadvantages while using stone dust as filler in pavements?
What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.
Can anyone tell me the salary and job profile of transportation engineers/transport engineer?
In reclamation works what are the importance of geotextiles and sand?
Anyone have sample questions for bhel please send me since Iam appearing for this exam. Kindly send this to my e-mail: nethaj_babu@yahoo.co.in
the amount of gypsum usuallyin the manufacture of cement
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)