extra how much quantity need to fill the actual excavated
quantity.
Answers were Sorted based on User's Feedback
Answer / nadim shaikh
depends upon the material by which the filling is needed
Is This Answer Correct ? | 0 Yes | 0 No |
backfilling is 1/3 rd of the excavated qnty.
Is This Answer Correct ? | 0 Yes | 2 No |
Answer / sjtbehera
actual excavated qty minus RCC qty plus PCC qty of the
structure.
Is This Answer Correct ? | 1 Yes | 5 No |
Describe Briefly The Various Methods Of Concrete Curing?
Define What glue is least sticky?
how much of the strength comes from post-production curing
HOW MANY CUBES REQUIRED FOR 7 AND 28 DAYS TEST FOR ALL MIX GRADES.
4 Answers Ansals, HFCL, Jaypee, Pratibha Group,
WHAT IS DIFFERANCE BETWEN TOR STEEL AND TMT STEEL
How much material will consume for following specification water tank (9*7.5*6 feet)?
how many area req.in 15000liter water tank
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
explain the rale of the government in the construction industry
what is Tsunami. explain it's formation.
for columns reinforcement the lap length is not provided then how to rebar the rods then how rebar should be lapped
4 Answers Nagarjuna Construction,
How do we say The LAP LENGHT is 50D to 60D ?????