extra how much quantity need to fill the actual excavated
quantity.
Answers were Sorted based on User's Feedback
Answer / nadim shaikh
depends upon the material by which the filling is needed
| Is This Answer Correct ? | 0 Yes | 0 No |
backfilling is 1/3 rd of the excavated qnty.
| Is This Answer Correct ? | 0 Yes | 2 No |
Answer / sjtbehera
actual excavated qty minus RCC qty plus PCC qty of the
structure.
| Is This Answer Correct ? | 1 Yes | 5 No |
What is plate load test?
what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same
how many nos of hacking over concrete surface required for 1 sq m area
12 Answers Creative Turnkey Projects, L&T,
WHAT GOAL DO YOU HAVE IN YOUR CARRIER?
What is the biggest dam in america?
why you are selecting the civil engineering
4 Answers gdcl, Sobha Developers,
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
what is meant by structural design
Rate of plasting per sq.ft...?
why curing is necessary?
how many m3, mason should done per day if he going to build 4.5 inch brick work(partition wall)?
Why do we use badarpur or crusher sand with coarse aggregate in a concrete mix?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)