extra how much quantity need to fill the actual excavated
quantity.
Answer Posted / nadim shaikh
depends upon the material by which the filling is needed
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
How to determine dia of steel for use in column,slab etc. i mean how to calculate the diameter of steel which is to be used in structures.
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
What are the different approaches in designing the floors of the service reservoirs?
I need model question papers for writing the Dubai municipality exam,for G+1
How to calculate quanty of steel in four leg stirrups?
what are the duties of Site Engineer in work site?
what is the 0 value in quantity surveying
What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
what is the use of beam end forces while using a staad ? wha they are show
There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?
What is the biggest dam in america?
"Gates of the dams are generally designed of curved shape". Why?