extra how much quantity need to fill the actual excavated
quantity.
Answer Posted / nadim shaikh
depends upon the material by which the filling is needed
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
What is the significance of cost estimate knowledge for an architect?
How to get MEP technical,instaaltion & testing data for interview?
how do you stabilize a waterlogged area in road construction
what is meant by shear center?????
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?
For fine aggregate which is most suitable River sand or crusher sand & why ?
what mean By core Billing
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
WHAT DLC DESIGN IN CONSTRUCTION
60-70 grade of Bitumen is VG-30 ?
Which are the Steel tests ?
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
how many material required for brickbat water proofing of toilets.
What is rate for brick masonry work of 1.0 m3 in cm 1:6?