extra how much quantity need to fill the actual excavated
quantity.
Answer Posted / nadim shaikh
depends upon the material by which the filling is needed
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
how can we calculate steel value, depending on load
what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
How to calculate brick work quantity?? Block work quantity??
What do you mean by tolerance factor of concrete ?
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
What does a construction cost covers and what does not?
how many tonnes equals to one cubic feet?
what is floating slab foundation?
what values & beliefs have guided you in your career path
what is the relation between pitch of steel and depth of slab?
foundation details for 25 ton weight Furnace on 2 supports and 2 tilters