extra how much quantity need to fill the actual excavated
quantity.

Answer Posted / nadim shaikh

depends upon the material by which the filling is needed

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.

1615


how can we calculate steel value, depending on load

1704


what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet

1162


Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?

2059


what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/

1823






How to calculate brick work quantity?? Block work quantity??

2116


What do you mean by tolerance factor of concrete ?

2675


1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM

2658


what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter

2028


What does a construction cost covers and what does not?

741


how many tonnes equals to one cubic feet?

1199


what is floating slab foundation?

677


what values & beliefs have guided you in your career path

2782


what is the relation between pitch of steel and depth of slab?

2908


foundation details for 25 ton weight Furnace on 2 supports and 2 tilters

1115