extra how much quantity need to fill the actual excavated
quantity.

Answer Posted / sjtbehera

actual excavated qty minus RCC qty plus PCC qty of the
structure.

Is This Answer Correct ?    1 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Aptitude, reasoning, quants, verbal and technical question

997


Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??

2238


Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct

1020


how to calculate the concrete mix m30 by volume

1101


How will you reduce the concrete flow after mixing the concrete

1729






how gradation of aggregates effect on slump of fresh concrete?

1833


how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you

1512


What is an object snap mode?

734


What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?

1348


Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.

1779


I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.

1526


how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building

2409


what is the meaning of 40/20 src

5769


What is Architect-Prepared Contract?

738


Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)

4556