extra how much quantity need to fill the actual excavated
quantity.
Answer Posted / mohd ameen
1m3 compacted = 1.8m3 dry excavated.
| Is This Answer Correct ? | 12 Yes | 3 No |
Post New Answer View All Answers
do we decide reinforcement steel , based on bending moment ? give example with continous slab?
what is grade intersection?
What year was the keystone power plant in Indiana County constructed?
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
How much material will consume for following specification water tank (9*7.5*6 feet)?
which formula used for calculate the area of segmental arch?
What is meaning of FREE STANDING STAIRCASE ?
what r you reqired for concrete baching plant?
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m
I am called for interview from north east power plant .so, I need some interview question which may help me.
how i convert mm into standard wire guage (SWG)no.
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
how many shuttering material required for 1000 sq.m built up area.