extra how much quantity need to fill the actual excavated
quantity.
Answer Posted / partha mitra
backfilling is 1/3 rd of the excavated qnty.
Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
how to calculate rate analysys of 1:6 plastering 10 sq m
Use of coping on terrace wall and in 4" wall is compulsory or not ?
What is the tallest man made structure in the world?
what is the difference b/w full length and cutting length?
How will be cutting in timber plate size 600*400 column size
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
How do we calculate absolute pressure?
how much used soil in 1 brick of standard size?
what is escalation?how it is done?
what is Short bored pile foundation.
what is labour consume factor in residential projects
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
What are the skills required to become an architect?
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.