Answer / mahbub alam
Use 1bag cement=(16.5-18.5)sq.m Neat finishing
so 1sq.m contains (2.7-3)kg.....
Is This Answer Correct ? | 57 Yes | 4 No |
Answer / sanchit guleria
1oo sq. ft = 9.3 sq.m contains 6 bags of cement.
so 1sq.m contains .65 bags = 32.5kg of cement
Is This Answer Correct ? | 14 Yes | 28 No |
above answer is wrong. simply
for one Sqm of neat Cement Finish With 15 mm thick plaster -
0.145 Bags of Cement Required For Sqm.
Calculation = 0.145 * 290=42.05
Sand = 0.015*1260 = 18.9
total Material Cost = 60.95
Labour Cost is = 90 / SQm
So all together = 150.95 Say 150.
from ur calculation
for one Sqm = 32.5 kg of cement
that means = 32.5 X (290/50)= 188.5 / Sqm
is it Any boq Neat Finish gave above 300/
Is This Answer Correct ? | 4 Yes | 19 No |
If I want to lab 16 mm dia. bar with 20 mm dia bar with 40D lap length which dia.should I consider for lapping
1:6 brick masonry cement and sand calculations
M20 Grade ratio? M30 Grade ratio? M40 Grade ratio ?
30 Answers AB Group, Aparna Enterprises, CECL, Engineers India, intex, Jain Group, Keystone, L&T, Multi Engineering, National, Shrinath Buildcon,
Is there the dry coefficient of cement is constant?
Why do not use fly ash bricks for waterproofing.
what is the size of 50 kg cement bag ? gunny & paper
why demand factor less then 1 ?
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
Rectangular room is more effective than a square room because ––
how to find the carpenter work per day? how many cubic feet they should be work per day?
what is the dimensions of river sand truck trailer or trolly ?
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.