how many bags of cement required in neat cement finish per
square metre
Answer Posted / kumar
above answer is wrong. simply
for one Sqm of neat Cement Finish With 15 mm thick plaster -
0.145 Bags of Cement Required For Sqm.
Calculation = 0.145 * 290=42.05
Sand = 0.015*1260 = 18.9
total Material Cost = 60.95
Labour Cost is = 90 / SQm
So all together = 150.95 Say 150.
from ur calculation
for one Sqm = 32.5 kg of cement
that means = 32.5 X (290/50)= 188.5 / Sqm
is it Any boq Neat Finish gave above 300/
| Is This Answer Correct ? | 4 Yes | 19 No |
Post New Answer View All Answers
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
What is the primary difference between adsorption and absorption?
WHAT IS YOUR CURRENT SALARY
how much cement and sand required for 100sqm of wall plastering in different proportions
why & what is perchatage we are using fly ash in concrete?
What is the difference between shear and tensile strength?
What is rate of concrete surface rendering work per sqm
What is a tensile strength? What is the tensile strength of wood?
what is the permanent solution applied for restoration of leaning tower of pisa?
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
Why are separation membranes used between concrete pavement slab and sub-base?
What are the types of slump?
how much shouid be the rate for ready mix concrete per cubic meter
What is the basic difference between OPC
what is high type road and low type roads