how many bags of cement required in neat cement finish per
square metre
Answer Posted / mahbub alam
Use 1bag cement=(16.5-18.5)sq.m Neat finishing
so 1sq.m contains (2.7-3)kg.....
| Is This Answer Correct ? | 59 Yes | 4 No |
Post New Answer View All Answers
What things you need to take care of before building a kitchen island?
What do you mean by bond? What are the different types of bonds?
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
it is a corrected question." make a list of engineering property(properties) of soil.
how many time use of plywood shuttering and IS code
what is total volume of ingredients used in concrete accordingly
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?
Describe the role of independent Quantity surveyor?
Explain the mechanism of cavitations in pipes and drains?
What are moment of inertia and its importance in civil engineering?
procedure for preliminary selection of size of column of 5 storey building