how many bags of cement required in neat cement finish per
square metre
Answer Posted / mahbub alam
Use 1bag cement=(16.5-18.5)sq.m Neat finishing
so 1sq.m contains (2.7-3)kg.....
| Is This Answer Correct ? | 59 Yes | 4 No |
Post New Answer View All Answers
In jack arch floor, the rise is kept?
What is Grid floor and mention its advantages ?
how to calculate load bearing column
what is the meaning of 40/20 src
why building got air crack? if it get in one particular are what is means?
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
How to activate isometric axes in cad?
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
can i get hindi version of is codes based on civil engineering?
how to do cementicious paint for rcc walls of cw pump house
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
Explain what is alternate bid?