what is water cement ratio m10,m15,m20,m25,m30,m35m ,m40
Answer Posted / ketan kumar bhatt
Water 0.45 for 1 : 1 : 2 concrete
Water 0.5 for 1 : 1.5 : 3 concrete
Water 0.5 to 0.6 for 1 : 2 : 4 concrete.
Is This Answer Correct ? | 33 Yes | 9 No |
Post New Answer View All Answers
what is work of planning deptt. in any construction compny (in road project)
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
What are the responsibilities of a construction manager?
what is Short bored pile foundation.
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
How much quantity of rod binding work by a rod binder per day
Which are the Steel tests ?
what is meant by shear center?????
How to find CN by using arcgis 9.3?
can any one explain bar bending schedule of bems and columns and slabs ??
Explain what is Critical Path Method (C.P.M)?
how to stop beam concrete between column
How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir