what is water cement ratio m10,m15,m20,m25,m30,m35m ,m40
Answer Posted / p.s.vijaya bhaskar
M10 concrete is very low grade so
Water-192/cum
Cement-150/cum
Flyash-150/cum
So water cement ratio-0.64 is ok after 28days 25mpa
U need more strength add cement content 20kg
Using the admixture is best way-1.5/cum
Because workabality
M20 grade
Water-185
Cement-160kg/cum
Flyash-150kg/cum
W/c-0.59
M30-grade
Cemnt-200kg/cum
Flyash-170kg/cum
Water-176
W/c-0.47
Thank u
| Is This Answer Correct ? | 10 Yes | 5 No |
Post New Answer View All Answers
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.
Whats the meanig of ,'K' VALUE in the case of soil.....
What do you mean by tolerance factor of concrete ?
What is the largest concrete dam in the world?
calculate the quantity of water for 1:6 cement mortar
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
what else we can add rather than admixture in concrete to reduce the cement quantity?
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?
Define What are the uses of Groynes?
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
When was the first motorway built in england?
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem