How calculate the water for 1m3 concrete
Answers were Sorted based on User's Feedback
Answer / fazil
practically 8 bags of cement need for 1m3 concrete
i.e 8 X 50 = 400 kg
as per IS code W/C = 0.45
400 X 0.45 = 180 lts of water needed
but water cement ratio must be taken from slump test
Is This Answer Correct ? | 41 Yes | 3 No |
Answer / rajeshkumarmaurya
its depends on Concrete Ratio.
For M5 - M20 = .4
M25 - M35 = .5
Is This Answer Correct ? | 13 Yes | 2 No |
Answer / abdullah
if structure is rcc then cement will be 380 kg . means no of
bag is 7.6.
for pcc then cement will be 360kg. means no. of bag is 7.1.
according to this u can find the quantity of water
Is This Answer Correct ? | 2 Yes | 6 No |
Answer / samyak jain
The Water Cement ratio is
W/C=0.45 (IS 456-2000)
Now, Multiply the volume cement wth void ratio(30%).
W/Vc*1.3= 0.45
W= 0.585*Vc.
ANSWERE.
Is This Answer Correct ? | 2 Yes | 7 No |
What is the bearing capacity of black cotton soil, normal soil and rock?
what is the tensile strength of 10swg and 8swg gabion wire?
why cracks develop at the upper corners of doors openings
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.
what is project?
How much overlapping required for welding the reinforcement bars in Columns & beams
what is the difference between compaction and consolidation?
What is the full form of APVC Pipe?
During reclamation how can the occurrence of mud waves can be rectified?
How to test the quality of Ready Mix M20 concrete (1:1.5:3) before casting at site when lorry arrives? Are there any methods?
what is the difference between sill beam,Tie beam and plinth beam?
what is RFI.How to prepare for slabs and beams connecting works to be executed.give order of work to be done.