How calculate the water for 1m3 concrete

Answers were Sorted based on User's Feedback



How calculate the water for 1m3 concrete..

Answer / fazil

practically 8 bags of cement need for 1m3 concrete

i.e 8 X 50 = 400 kg

as per IS code W/C = 0.45

400 X 0.45 = 180 lts of water needed

but water cement ratio must be taken from slump test

Is This Answer Correct ?    41 Yes 3 No

How calculate the water for 1m3 concrete..

Answer / rajeshkumarmaurya

its depends on Concrete Ratio.

For M5 - M20 = .4
M25 - M35 = .5

Is This Answer Correct ?    13 Yes 2 No

How calculate the water for 1m3 concrete..

Answer / rajkumar

.45 TO 0.6 DEPEND UPON THE MIX DESIGN

Is This Answer Correct ?    5 Yes 1 No

How calculate the water for 1m3 concrete..

Answer / rohit

Depend on tthe grade slump n cement per cum

Is This Answer Correct ?    0 Yes 0 No

How calculate the water for 1m3 concrete..

Answer / abdullah

if structure is rcc then cement will be 380 kg . means no of
bag is 7.6.
for pcc then cement will be 360kg. means no. of bag is 7.1.
according to this u can find the quantity of water

Is This Answer Correct ?    2 Yes 6 No

How calculate the water for 1m3 concrete..

Answer / samyak jain

The Water Cement ratio is
W/C=0.45 (IS 456-2000)

Now, Multiply the volume cement wth void ratio(30%).

W/Vc*1.3= 0.45

W= 0.585*Vc.
ANSWERE.

Is This Answer Correct ?    2 Yes 7 No

Post New Answer

More Civil Engineering Interview Questions

What is the bearing capacity of black cotton soil, normal soil and rock?

2 Answers   Gammon, Mid India,


what is the tensile strength of 10swg and 8swg gabion wire?

0 Answers  


why cracks develop at the upper corners of doors openings

1 Answers  


Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.

0 Answers  


what is project?

0 Answers   PMC,






How much overlapping required for welding the reinforcement bars in Columns & beams

3 Answers  


what is the difference between compaction and consolidation?

4 Answers  


What is the full form of APVC Pipe?

1 Answers   GSECL,


During reclamation how can the occurrence of mud waves can be rectified?

0 Answers  


How to test the quality of Ready Mix M20 concrete (1:1.5:3) before casting at site when lorry arrives? Are there any methods?

0 Answers  


what is the difference between sill beam,Tie beam and plinth beam?

2 Answers   L&T,


what is RFI.How to prepare for slabs and beams connecting works to be executed.give order of work to be done.

0 Answers   bscpl,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)