What is Paste :
how to calculate steel for slab or footings?
what is the specification for silt content in sand
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
Formula for calculation volume of essentric footing
how can u extent the final setting time of cement?
2 Answers Sobha Developers, TNPSC Tamil Nadu Public Service Commission,
WHAT IS DIFFERANCE BETWEN TOR STEEL AND TMT STEEL
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
what if tie beams coming from x axis do not meet tie beam coming from y axis? Is it safe if they dont meet?
pl.may i place dry mix in casting of drain bed partialy filled with water?if no pl explain.
how you confirm the hard stratum for driven cat in situ pile work?
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
How to calculate quantity of plum masonry in 1:3:7
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)