Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how many 1st class bricks in 1cu feet?

Answers were Sorted based on User's Feedback



how many 1st class bricks in 1cu feet?..

Answer / basirul islam

The standard size of masonary bricks is =19cm*9cm*9cm
=0.623ft*0.295ft*0.295ft
=0.0542cub feet
so no of bricks in 1cubfet =1/0.0542 nos
=18.45 nos

Is This Answer Correct ?    19 Yes 18 No

how many 1st class bricks in 1cu feet?..

Answer / fazal haq khan

1350 Bricks in 100 cft
so Than
1350 / 100 =13.5
we know That
Now
we have Find
1Cft =13.5 Bricks
So The Ans Is
13.5 bricks In 1 Cft

Is This Answer Correct ?    1 Yes 0 No

how many 1st class bricks in 1cu feet?..

Answer / amir shehzad

Check my blog for detail answer sheet.

http://bricks-calculations.blogspot.com/2011/07/proof-of-135-brick-in-1-cft.html

Is This Answer Correct ?    0 Yes 0 No

how many 1st class bricks in 1cu feet?..

Answer / shehzad nazar

Guys you can follow this link to check how it works for bricks calculations. also an online sheet to get number of bricks for each size.

http://qs-learner.blogspot.com/2016/04/bricks-calculation.html

Is This Answer Correct ?    0 Yes 0 No

how many 1st class bricks in 1cu feet?..

Answer / surya prakash upadhyay

1 cub feet volume have 15 bricks

Is This Answer Correct ?    1 Yes 1 No

how many 1st class bricks in 1cu feet?..

Answer / robin

1 cubic feet = 14.769 bricks with hole, without mortar

Is This Answer Correct ?    0 Yes 0 No

how many 1st class bricks in 1cu feet?..

Answer / johnpeterraj001@gmail.com

1 cubic feet is 11.62 bricks in practical constraction

Is This Answer Correct ?    0 Yes 0 No

how many 1st class bricks in 1cu feet?..

Answer / bala

1cft = 13.50 no. S of bricks work

Is This Answer Correct ?    0 Yes 0 No

how many 1st class bricks in 1cu feet?..

Answer / ijaz

volume of brick= .75'x.25'x.375'
volume=.070cu ft
now in 100 cft = 100/0.070
=> 1428.57 nomber of bricks
now 10% mortar /////
deduction of mortorr= 10x1428.85/100 = 142.85
nomber of bricks
so net number of bricks = 1428.57-142.85= 1285.72
now for contengencies = 5%
so => 5x1285.72/100= 64.28
now the total number of bricks= 64.28+1285.72=1350.0061

Is This Answer Correct ?    0 Yes 0 No

how many 1st class bricks in 1cu feet?..

Answer / dommeti kishore

One cubic metre contains 512 bricks .Hence proved

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

How to calculate woden area in sft and Cft

0 Answers  


binding wire requirement in rcc structures

6 Answers  


what is the difference between onw way slab & two way slab?

4 Answers  


how to take the quantity of block work and plastering  1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate

0 Answers  


what is plum & mass concrete?

9 Answers   Shri Construction,


What is the correct position of lapping splice of reinforcement steel bars in a beam at top & bottom of the beam?? what is the reason for this location?..what are the factors affecting lapping location in beam?

6 Answers   SPCL,


lap length formula

7 Answers  


what are the differences between Tie beam, Ground beam and strap beam. thanks

1 Answers  


why provide water stopper in costruction joits

1 Answers   L&T,


A bill was raised by contractor which read as follows 1.) Excavation in normal soil upto 1.5m - 250 cum 2.) Excavation in normal soil 1.5m to 3m - 240 cum 3.) Excavation in soft rock - 350 cum 4.) Excavation in hard rock - 250 cum 5.) Filling with available soil - 825 cum 6.) Filling with bought out soil - 1100 cum How can I verify the above quantities, especially for item no. 5 & 6? What checks are necessary before releasing the bill ?

5 Answers  


Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day

0 Answers  


What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)

0 Answers   Reliance,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)