how many 1st class bricks in 1cu feet?
Answer Posted / amir shehzad
Check my blog for detail answer sheet.
http://bricks-calculations.blogspot.com/2011/07/proof-of-135-brick-in-1-cft.html
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm
Is it possible to make a feature using an overdefined sketch?
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
Formula of mid span bar
Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method
Specific gravity of cement?
Which IS Code/American Code applied for coupler test of steel
What is the outturn of Ceiling plastering
How to improve the strength of fly ash bricks to avoid corner damge? How to get the color lighter similar to normal concrete blocks/
what is difference between GTS bench mark and temporary bench mark
Why Should Curing Not Be Done By Ponding And Polythene Sheets?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??