What is the bearing capacity of black cotton soil, normal
soil and rock?
Answers were Sorted based on User's Feedback
Answer / s p sharma
Black cotton - < 10t/sqm
normal soil - 10 to 20t/sqm
rock - more than 30t/sqm
Is This Answer Correct ? | 37 Yes | 4 No |
Answer / shyam.bh
BC for different stratas as follows,
clay or black cotton soil = 20 mt/sqm,
soft rock = 20 - 90 mt/sqm,
hard rock = > 210 mt/sqm
Is This Answer Correct ? | 13 Yes | 14 No |
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
What are the responsibilities of a site manager?
what is the size of shuttering?????
4 Answers SKV Builders and Development Pvt Ltd,
Whats meaning of DBD in soil subject
Process of pcc in wateredug
how to calculate the steel for beams and columns for tender purpose? any formula have?
what does the track parameter mean in staad.pro?
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
Q1) I am having an interview in a construction company for a large sewage project . Since I have not done any such project , there are some queries from my end. Pls. help me to solve them. I will be thankful to you :- a) Normally for large project 400-600 houses & around 1600 peoples , how much dia pipe is used and which type of pipe is used? b) For trenching , I have heard that IS 1200 implies, what are the rules of calculating earthwork in case of depth of 2m or above ? c) To prevent soil to fall when depth of trench is more , what steps are taken and how there qty. is calculated . Like I have heard about timbering . what is this ? d) What are the rules for disposing off the excavated soil ? e) How the pipes that are used are being jointed? f) In case of cleaning on choks , is there any intermediate things provided? g) For foul gases any outlets are provided thru out length of pipeline? h) What is the flow digram like from houses thru small pipe to main pipeline than where main pipeline disposes wastage ? i) Any other thing that has to be kept in mind while calculating earth work for excavation like steps are made and other things? How earthwork is calculated in case of steps ? Pls. explain with a sketch. Regards,
why does only water ads in concrete?
Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......