Answer Posted / patel
1.level the surface
2. prevent dampness
3.avoid corrosion
Is This Answer Correct ? | 22 Yes | 1 No |
Post New Answer View All Answers
for pretensioning which will yield first and same for post tensioning?
What is the snap size in civil and how can we create it?
Write short note on construction programme for pile foundation.
What are the strongest shapes in building?
How does a traffic light signal work ?
How do you prepare Material Recovery Statement for deduction from contractors bills?
What are advancements in civil engineering?
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?
List out the potential risk factors for workers on the construction site?
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
Explain what are the skills required to become an architect?
How can explode a block?