what"s the formula find the cement consumption for brick work
23 thick wall 1 m3?
Answers were Sorted based on User's Feedback
Answer / guest
(1/(0.2*.1*.1))=500
=500*(.19*.09*.09)=0.76 cum of brick volume
=1-.76 = 0.24 mortor volume
=0.24
| Is This Answer Correct ? | 86 Yes | 26 No |
Answer / anandh kumar g
first we have to find out the CM ration after thatonly we
can able to finout the cement content
| Is This Answer Correct ? | 41 Yes | 12 No |
Answer / mohammed aijaz hussain
Volume of Dry Mortar = 35% of volume of Brickwork
Let the Cement Mortar Proportion be CM(1:4)
Volume of mortar required = 0.35 X 1 = 0.35 cu.m.
Cement required = 1/5 X 0.35 = 0.07 cu.m. = 2 bags
Sand required = 4/5 X 0.35 = 0.28 cu.m.
| Is This Answer Correct ? | 46 Yes | 22 No |
(1/(0.2*.1*.1))=500
=500*(.19*.09*.09)=0.76 cum of brick volume
=1-.76 = 0.24 mortor volume
=0.24
so
for 1:4 cement mortor it require 1% cement and 4% sand
0.06 cu.m of sand is required
| Is This Answer Correct ? | 6 Yes | 1 No |
Answer / paramesh
25% 0f mortar in 1cum of 230 thick brick wall.
(ie) 0.25cum of mortar.calculate the cement content by its
ration.
| Is This Answer Correct ? | 9 Yes | 5 No |
Answer / sri
volume occupied by brick=100x.19x.09x.09=.153cu.m
volume of brick 1x1x.23=.23cu.m
volume of joints=0.23-0.153=0.077cu.m
mortar to fill up frogs=100x.10x.04x.01=.004cu.m
total mortar=.077+.0040=0.081cu.m
| Is This Answer Correct ? | 52 Yes | 49 No |
Why shoring is employed in building industry?
How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft
Respected Sir, I am from a hilly place called Darjeeling ,I have constructed house of 9 column out of which 4 of the column is under water , i have put rcc slab on top and on top of the rcc slab i have construced two room house with bricks and light roof , now i am planning to change the light roof with rcc slab for the two room, my main concern is will the column under water will hold the load of the new rcc slab coz it already 10 to 12 yrs old , i dont know what to do , can u advice me regarding this matter, weather to leave the upper floor roof light or make it rcc slab.(If i put the slab , it will require 45bags of cement and u calculate how much of steel and sand and pebbles) thanks with regard Anand
Steel Calculation for Footing, Beam & Columns?
what is the proportion of stones and concrete inplum concrete??
how to calculate the bricks in 100yard
How many cement & sand require in 300 sq ft plaster 8mm thickness
1 Answers Kirthi Construction,
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
I need to constructive work in amaraj batteries
Explain what are the phases inspections are done by local authority while construction?
Difference between lateral ties and stirrups?
WHAT IS THE LAP LENGTH FOR COLUMN WITH DESIGN MIX M-35 RCC
7 Answers Omaxe, Shoba Devlopers,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)