I have situaition where, the items are prices on the bases
of weight (KG). Now we are to run a offer where 20% extra
is given free within the same pack (1KG + 202G free). It
means new material with its own specification.
The client want to maintain the same price for the 1.2 kg
pack. It is not ready to reduce the price on quantity
basis.
How can be make a functionality where, the system will
calculate the price for 1 kg only while the material net
weight is 1.2 kg.
Answers were Sorted based on User's Feedback
Answer / param
while making PO create 2 line items with same material. one
with quantity 1Kg and another with 0.2Kg. Tick the 2nd line
item as "FREE". hence system will not consider the price
for 2nd line item.
Is This Answer Correct ? | 23 Yes | 4 No |
Answer / shriya
Go to ME12 and click on the condtions tab a pop up box
will open whci will have a order uit . Doubble click on
this tab abd this will take you to the condtions screen
now in that you give the condtion type and details with
the price and no top of the menu bar you will have free
goods condtion click on it and it will lead you to the
condtion of free goods in that clck on inclusive condtion
and enter your requirement and save .
So now when ever you create a purchase order for the frist
material you will have a free good created int he
backgrond and at the tie of delivery you will be able to
see this item also to be delivered .
Is This Answer Correct ? | 13 Yes | 2 No |
Answer / jagadish. s
we have to use scaling option in po. Suppose to say we can
have 50 qty for 100. if suppose he takes 80 qty we can
reduce to 70 and if he takes for 100 qty we can sell it to 60/-.
so with this example we can give him 1.2 kg and at the same
time we can have same price. and we can maintain good
impression of company on customer.
Is This Answer Correct ? | 0 Yes | 16 No |
How can you disable a reservation in mrp?
What are the fields in Purchasing view?
What is the interaction between sap mm and sap abap consultant?
If I have one PO with me & I made GR with partial Qty & after that I want to block PO for one month means user shouldn't make GR against this PO & after one system should allow to make GR. In this case where I need to do changes?
How did different versions of sap evolve?
which institute and which faculty is best for SAP MM traing in Hyderbad?
How you can create a vendor account group in sap?
What is special about one time vendor?
What is the Purpose of "Info update" indicator in Purchasing document? Regards, sand....@
What are the levels at which a batch number can be configured?
What do you mean by reservation?
The PO table name @ header, Item, Delivery Schedule