how we receive by products ,scrap material from subcontract
vendor what movements types we use while doing this
Answers were Sorted based on User's Feedback
Answer / pankaj deshmukh
Maintaining this material in BOM as a negative & receive this from sub contractor thro.545 movement.
Is This Answer Correct ? | 14 Yes | 1 No |
Answer / zebronic
Byproduct,scrap materials can be received from Subcontactor
by maintaining these product as -ve component.when GR
recepit is done supplied components will get consumed
through movement type 543.-VE component will appear
as "Material Provided to Vendor" Mov type will appear
545.Now do the 542 for repsective -ve compoennt to get the
same in Unrestricted use.
Is This Answer Correct ? | 10 Yes | 1 No |
Briefly describe the history of the sap software?
how a support individual will receive Tickets/issues from client
What do you mean by consignment stock?
What is release procedure?
What are the main components of the mm module? How are these components used in sap?
What information is available in the 'accounting view' of a 'material master'?
In which condition, "Transfer Order" can be deleted? What is the pre-condition for us to be able to delete Transfer Order?
What is the procedure of RFQ release strategy ?
What are departmental views?
Explain the 'transaction keys' in mm?
A PO has 50 items all the 50 items have the same price. Instead of entering the price for each item 50 times is there any option in SAP where the common price can be entered in one go?
Can we change the layout of miro screen? Does it require enhancement?