wet mortar =100*.015=1.5
dry mortar =1.5*1.2 =1.8
ratio =1:4 (assumed)
sum =1+4=5
sand =4*1.8/5=1.44 cu m (answer)
Is This Answer Correct ? | 32 Yes | 7 No |
Answer / kumar navneet
Unit- 1sqm ; take 100sqm
Qty of mortar req to plaster wall= 100sqm x .015m=1.5cum
To make up for uneveness inc by 30% = 1.5+ (1.5x30)/100= 1.95cum
Inc by 25% the total dry volume = 1.95+ (1.95x30)/100
= 2.34 cum
for 1:4 cement sand mortar (Assumed)
Cement = 2.34/(1+4)= 0.468cum
Sand = 0.468 x 4= 1.872cum
Is This Answer Correct ? | 3 Yes | 1 No |
Answer / qaisar imtiaz
15MM PLASTER FOR 100 SQ.M
THEN TOTAL AREA IS MEAN 10*10=100 SQ.M
10*10*0.015=1.5 CUM
RATIO =1:3
FOR CEMENT =1.5/4*1=0.375/0.0354=10.60 BEG
FOR SAND = 1.5/4*3=1.125CUM
Is This Answer Correct ? | 1 Yes | 2 No |
Answer / er. shivam dixit
15 mm plaster for 100 sq. m.
then the total quantity = 1500 cu. m.
let us consider the cement plaster proportion is 1:4
then the total sum of the proportion = 5
total dry mortar required for 1cu. m. = 0.40
the sand required for one cu. m. = (4*0.40)/5 = 0.32 cu. m.
so the total sand required 15mm plaster for 100 sq.m.
= 15*100*0.32 = 480 Cu.m.
Is This Answer Correct ? | 2 Yes | 36 No |
what is the maximum number of course that can be laid according to IS code and the max height.
1m3 of brick is equal to how many cft of brick
DEFINATION OF CIVIL ENGINEERING
how much quantity of cement,sand and water required for 1 sq feet flooring work .
quantity of material needed for rubble stone masonry for 1:4 and 1:6
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
among the strectcher, header, english and flemish bond which has greater strength? where these bonds are preferred?????
Please tell me present is code no for steel structure work. Thanks.
how to conversation of all construction material in to brass
how to calculate the required qantities of cement, Sand and aggrigate to prepare 1 Cum of concrete mix 1:2:4
which I.S. code shown wastage in structural steel
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?