calculate qty of sand in 15 mm plaster for 100 sqm.
Answer Posted / kumar navneet
Unit- 1sqm ; take 100sqm
Qty of mortar req to plaster wall= 100sqm x .015m=1.5cum
To make up for uneveness inc by 30% = 1.5+ (1.5x30)/100= 1.95cum
Inc by 25% the total dry volume = 1.95+ (1.95x30)/100
= 2.34 cum
for 1:4 cement sand mortar (Assumed)
Cement = 2.34/(1+4)= 0.468cum
Sand = 0.468 x 4= 1.872cum
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
3. What are the disadvantages of your present job, things you do not like about it?
How do you compute volume of airflow?
what is features of a typ-ical modern air-conditioning installation?
how to calculate reinforcment in staircase cranked beam?
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
How do you calculate the power of a centrifugal pump?
What are the basic use of runners and standards of pipelines?
Types of column foundation and how to calculate its steel quantity.
I need to do a Compressive Strength Test for a specimen made of Rubber. Before doing the Test on the Machine, I need to have an idea of the Minimum and Maximum Compressive Strength or Yield Strength of the specimen. How can I calculate that?
how lap length is increased with increase of Grade of steel?
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
Why should pumping be not used in case of concreting work?
What is meant by engineering drawing?