can we control operation of PLC from operator station?

Answers were Sorted based on User's Feedback



can we control operation of PLC from operator station?..

Answer / nilesh

Question not clear.

1.PLC has its own controller which execute the
program.Before every program run PLC read the input and
after program execution generate output accordingly.
2.If PLC I/O need to be control from operator station (
DCS/SCADA) then PLC need to be connected to OS through
serial link/Ethernet

Is This Answer Correct ?    5 Yes 0 No

can we control operation of PLC from operator station?..

Answer / kawa

Yes of course we can either through its own HMI or through
seiral liks with some other control system (DCS).

Is This Answer Correct ?    0 Yes 0 No

can we control operation of PLC from operator station?..

Answer / ashish namdev

Operation station system no have any program (programming built in Engg. Station Only which is a server also)

but operating station system is connected with same network of plc/Dcs through Ethernet or other.

than that station has a SCADA software which is connect it to server system station through IP protocol.

 than we can access or give command through Operating station.



Ashish Nmadev
Sr. Engg In Jaypee thermal power plant, Bina(MP)   

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Instrumentation Interview Questions

What is mean by trim?

5 Answers  


can anybody tel me how a vfd or any field instrument communicates/interface with plc/scada/cs.

0 Answers   Honeywell,


How a rtd work, and what volts/current goes to a RTD to measure the resistence?

1 Answers   DVC,


what is the basic principal of vertax flow meter

3 Answers   Balrampur Chini Mill, Saba,


how the 2.5bar pressure able to control the 40bar steam

8 Answers   IBM, PAFL, Thirumalai Chemicals,






what is formula mv convert to temperture

4 Answers   Sterlite,


What is the main three inputs of DCS?

1 Answers  


Can SmartPlant Instrumentation be used in a concurrent engineering environment?

1 Answers  


there are two candidates p and q in an election.During the campaign,40% of the voters promised to vote for P ,and rest for Q.however, on the day of election 15% of the voter went back on their promise to vote for P and instead voted for Q. 25% of the voters went back on their promise to vote for Q and instead voted for P.suppose,P lost by two votes,then what was the total no. of voters.

4 Answers   GATE,


What is the basic difference between Modbus and CAN Open Protocols

0 Answers  


Explain the difference between mmwc and mmwg?

0 Answers  


How to Calibrate Vibration Probe (Axial, Redial) in field

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)