can we control operation of PLC from operator station?
Answer Posted / nilesh
Question not clear.
1.PLC has its own controller which execute the
program.Before every program run PLC read the input and
after program execution generate output accordingly.
2.If PLC I/O need to be control from operator station (
DCS/SCADA) then PLC need to be connected to OS through
serial link/Ethernet
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
Explain the working of rota meter.
Question on maha cement
Explain the burnout feature.
what is performance test.need defination
it is possible to check the fail safe condition in pressure transmitter. if possible how?
What is three element drum level control system why its better than single element?
Describe a time when you anticipated potential problems and developed preventive measures.
what diffrence b/w plc s7200,300,400
Is it ok, to use non-contact type Radar type LT, on a tank that is half circular from the bottom side? If yes the, isn't the waves gonna bent in other directions?
Which topics are covered in Process Control?
what is the vital subject for scoring bhel exam&what is the question pattern
Where Can i take a SPI INtools training in Mumbai? In Rolta India Ltd to whom I should approach regarding of SPI INtools Training?
Draw symbols of the following :
In bently nevada vibration monitoring system,what is the reason to maintain the Resistance of the probe + extension cable equal to 95 ohm? If possible explain the basic principle of measurement with detail electronic circuits.
Dear Friends, we are planning to design Power distribution and Fiber optic in the same cabinet.Like Front side Fiber optic and Rear side Power distribution.Is it any possibility of problem occurs like interference etc? Your answer is highly appreciate.