WHAT YOU MEAN BY PROOF STRESS?
Answers were Sorted based on User's Feedback
when a material such as Aluminium doesn't have an obvious
yield point and yet undergoes large strain after the
proportional limit is exceeded an arbitrary yield stress may
be determined by Offset method .A line parallel to initial
part is drawn which is offset by some standard amount of
strain such as 0.2 % ,the inersection of the offset point
defines the yield stress which is slightly above the
proportional limit and is called 'PROOF STRESS'.
| Is This Answer Correct ? | 67 Yes | 11 No |
Answer / p. elango
Many alloys do not show either a definite elastic limit or
yield point. Because of the importance of the yield point
to designers, calculations have been developed to produce
an artificial approximation. This approximation is known
as ‘proof stress’ and relates to a pre-determined amount of
permanent deformation measured against the strain axis.
A line parallel to the initial gradient of the stress strain
diagram is drawn. Where the drawn line and the curve
intersect is the proof stress . Proof stress is
most often calculated around the values of 0.1% and 0.2%
of the gauge length.
| Is This Answer Correct ? | 8 Yes | 1 No |
Answer / venkatraman
when draw 0.2% parallal line to stress- strain curve from the
orgin in x direction(strain) it will meet in curve at a point
that point is yield point corresponding stress value is proof
stress
| Is This Answer Correct ? | 8 Yes | 9 No |
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
a)tell density of steel , concrete, bricks , sand and aggregates.? b) what is knife test for wooden doors ? c) what is the meaning of term abrasion? what is tested in it? d) why pile foundation is provided in BCS?e) By total station what activities can be performed and on what principle it works? f) what is creep?
How much snowcem required per sq. Meter area
3 Answers Bhushan Power Steel,
extra how much quantity need to fill the actual excavated quantity.
What is limit state method and working stress method and ultimate method
Explain what is progress payment?
Pls provide me with the calculation or codes related to de- shuttering of flat slabs
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
10 Answers ACC, Awasthi Construction, Bitulink, Mir Akhter Hossain, SOT,
What is Purpose Of Stirrups give In Beam ?
mix design of concrete using indian standard methods
Explain what is alternate bid?
How many steel is require in one cubic meter area?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)