My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
No Answer is Posted For this Question
Be the First to Post Answer
what is the IS code no. for concrete wastage?
What is the density of pcc considered in structure design for load calculation
how to find the diameter of steel bar from steel area
What is the bar bending schedule
Diversion of cum to cft
If a 20 years old building without columns was going to renovation having a thickness of walls 12" is it Withstand the load of a new structure of having load of 1150k.g including live&dead loads?
1 Answers Construction, Ryna Facilities Services,
What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.
how much quantity of cement(bags)concrete(20mm)and sand(sqft)is used in 1:3:6 PCC
When was the first motorway built in england?
Civil engineering material testing Standard results
0 Answers SUCG Infrastructure,
why we can use dust in concrete insted of fly ash
Where hinge support is used in residential building?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)