How to calculate cement quantity in m20 concrete
Answers were Sorted based on User's Feedback
M20 concrete means 1:1.5:3
M20 = 1:1.5:3
Volume = 1+1.5+3=5.5
Total volume ingredients for using =1.57
Volume of broken stone Require = (3/5.5) x 1.57 = 0.856 m3
Volume of sand Require = (1.5/5.5) x 1.57 = 0.471 m3
Volume of cement = (1/5.5) x 1.57 = 0.285 m3
= 0.285 x1440 = 411 kg = 8.22 bags
| Is This Answer Correct ? | 14 Yes | 1 No |
calculation of cement quantity in m20 concrete
M20 = 1:1.5:3
Volume = 1+1.5+3=5.5
Total volume ingredients for using =1.57
Volume of broken stone Require = (3/5.5) x 1.57 = 0.856 m3
Volume of sand Require = (1.5/5.5) x 1.57 = 0.471 m3
Volume of cement = (1/5.5) x 1.57 = 0.285 m3
= 0.285 x1440 = 411 kg = 8.22 kgs
| Is This Answer Correct ? | 4 Yes | 2 No |
how bitumen is prepared for NH,SH &other roads
The ff slab casted its thickness 100mm.2nd floor slab will be casting its 300 mm.how we shall be given suppot to that 300mm thk slab.ple way me
10'0" × 10'0" Proposed room Start and Finish How many Cement & Sand & Bricks & Metals & Steels Need
How many bricks are there in 100cft?
What is diversion tunnel in a dam?
how much steel in one sq m slab?
6 Answers J Kumar, Jaitly Associates, L&T, MEIL, Super House, United Nations Office for Project Services (UNOPS),
Respected Sir, I am from a hilly place called Darjeeling ,I have constructed house of 9 column out of which 4 of the column is under water , i have put rcc slab on top and on top of the rcc slab i have construced two room house with bricks and light roof , now i am planning to change the light roof with rcc slab for the two room, my main concern is will the column under water will hold the load of the new rcc slab coz it already 10 to 12 yrs old , i dont know what to do , can u advice me regarding this matter, weather to leave the upper floor roof light or make it rcc slab.(If i put the slab , it will require 45bags of cement and u calculate how much of steel and sand and pebbles) thanks with regard Anand
I'm puting roof slab M20 Design Concrete,Twoway slab how many days wait for remooving of shuttering?
what are the types of flow? what is terbulent flow?
I need old MMUP exam question and answer for Civil engineering
What is type failure of road surface? how to repair the failure of road surface?
what is grid line? why are we provided small dia reinforcemen in slab against beam n column?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)