How to calculate cement quantity in m20 concrete
Answers were Sorted based on User's Feedback
M20 concrete means 1:1.5:3
M20 = 1:1.5:3
Volume = 1+1.5+3=5.5
Total volume ingredients for using =1.57
Volume of broken stone Require = (3/5.5) x 1.57 = 0.856 m3
Volume of sand Require = (1.5/5.5) x 1.57 = 0.471 m3
Volume of cement = (1/5.5) x 1.57 = 0.285 m3
= 0.285 x1440 = 411 kg = 8.22 bags
Is This Answer Correct ? | 14 Yes | 1 No |
calculation of cement quantity in m20 concrete
M20 = 1:1.5:3
Volume = 1+1.5+3=5.5
Total volume ingredients for using =1.57
Volume of broken stone Require = (3/5.5) x 1.57 = 0.856 m3
Volume of sand Require = (1.5/5.5) x 1.57 = 0.471 m3
Volume of cement = (1/5.5) x 1.57 = 0.285 m3
= 0.285 x1440 = 411 kg = 8.22 kgs
Is This Answer Correct ? | 4 Yes | 2 No |
how many average of shuttering in one cubic meter concrete
Which Cement is good for concrete, Is that grade 33, 43 or 53?
how to do rate analysis for P.C.C 1:4:8 for 2.83cum(100cft)
2 Answers Unity Infraprojects,
What is the meaning of 'variation' in construction of residential buildings
Name the main components of a cad gui?
what is mean by tremie concrete
Types of Water Proofing Material?
How much binding wire is required for one tone reinforcement ?
21 Answers ARS, Gammon, L&T, Lodha, Pratibha Industries,
I had a plot of say 5000 sq.ft. and soil in the plot is normal soil. Now I had to work upon the tender quantities to prepare a preliminary budget within a day. Is there any thumb rule or assumptions to calculate the quantities which can differ upto 15% +/-?
a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
what is relation between SPT N value and driving piles after conducting a soil test?
hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft