How to calculate cement quantity in m20 concrete

Answers were Sorted based on User's Feedback



How to calculate cement quantity in m20 concrete..

Answer / jayaprakashsst

M20 concrete means 1:1.5:3

M20 = 1:1.5:3
Volume = 1+1.5+3=5.5
Total volume ingredients for using =1.57
Volume of broken stone Require = (3/5.5) x 1.57 = 0.856 m3
Volume of sand Require = (1.5/5.5) x 1.57 = 0.471 m3
Volume of cement = (1/5.5) x 1.57 = 0.285 m3
= 0.285 x1440 = 411 kg = 8.22 bags

Is This Answer Correct ?    14 Yes 1 No

How to calculate cement quantity in m20 concrete..

Answer / jayaprakashsst

calculation of cement quantity in m20 concrete

M20 = 1:1.5:3
Volume = 1+1.5+3=5.5
Total volume ingredients for using =1.57
Volume of broken stone Require = (3/5.5) x 1.57 = 0.856 m3
Volume of sand Require = (1.5/5.5) x 1.57 = 0.471 m3
Volume of cement = (1/5.5) x 1.57 = 0.285 m3
= 0.285 x1440 = 411 kg = 8.22 kgs

Is This Answer Correct ?    4 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

how many average of shuttering in one cubic meter concrete

5 Answers  


Which Cement is good for concrete, Is that grade 33, 43 or 53?

10 Answers   Modi Builders,


how to do rate analysis for P.C.C 1:4:8 for 2.83cum(100cft)

2 Answers   Unity Infraprojects,


What is the meaning of 'variation' in construction of residential buildings

0 Answers  


Name the main components of a cad gui?

0 Answers  






what is mean by tremie concrete

3 Answers  


Types of Water Proofing Material?

2 Answers  


How much binding wire is required for one tone reinforcement ?

21 Answers   ARS, Gammon, L&T, Lodha, Pratibha Industries,


I had a plot of say 5000 sq.ft. and soil in the plot is normal soil. Now I had to work upon the tender quantities to prepare a preliminary budget within a day. Is there any thumb rule or assumptions to calculate the quantities which can differ upto 15% +/-?

2 Answers  


a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing

0 Answers  


what is relation between SPT N value and driving piles after conducting a soil test?

0 Answers  


hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft

0 Answers   SOM,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)