As per Indian Standards:
1. Vertical form work to Beams = 16 to 24 hours
2. Props to beams Spaning up to 6.00m = 14days
3. Props to beams Spaning up to 6.00m = 21days
4. Props to be refixed immediately after
removal of form work = 7days
Is This Answer Correct ? | 11 Yes | 2 No |
Answer / yisahak
Generally form-work shall be stripped off after the concrete has attained 50% of the 28 day cubic strength, or when it attain twice the stress it will then be subjected after the removal of the form-work, which ever is greater.
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / sourish
Stripline is a beam diagnostics device used to measure beam
position/phase in particle accelerators.
Is This Answer Correct ? | 1 Yes | 3 No |
Unit weight of brick? Sand? Aggregate? Steel? Cement? Water?
28 Answers Aliens Group, Cemplex, DLF, L&T, LBC, Power Trade Engineering, Vishnu, VKM,
What is the full form of APVC Pipe?
what is the density of the polythene sheet
What are the specification of good quality sand for plaster and brickwork?
what is meant by csr in foundation? what is sbc?what is meant by contour line?
How many no of bars in a bundle of steel and kgs/bundle. 8 mm, 10mm, 12mm, 16mm, 20mm with both MS and TMT separate.
Plan and schedule for 14 towers of 6 floors each with 6 flats on each floor?
define the strength
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
What is tha cutting lenght off samosa ring in column 300*600.
A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S
rate analysis for cement pointing 1:4 , for 100 sq m