what is the stripping time of beam?
Answers were Sorted based on User's Feedback
As per Indian Standards:
1. Vertical form work to Beams = 16 to 24 hours
2. Props to beams Spaning up to 6.00m = 14days
3. Props to beams Spaning up to 6.00m = 21days
4. Props to be refixed immediately after
removal of form work = 7days
| Is This Answer Correct ? | 11 Yes | 2 No |
Answer / yisahak
Generally form-work shall be stripped off after the concrete has attained 50% of the 28 day cubic strength, or when it attain twice the stress it will then be subjected after the removal of the form-work, which ever is greater.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / sourish
Stripline is a beam diagnostics device used to measure beam
position/phase in particle accelerators.
| Is This Answer Correct ? | 1 Yes | 3 No |
How to calculate construction cost of residential building in mumbai
Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..
How much steel required in 900 square feet slab?
17 Answers RCC, Sai Steel Corporation, TATA,
What are the grade of steel used in the concrete design.?
8 Answers Engineers India Limited,
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
how to estimate the earthwork,earth-filling for an isolated foundation
comparision difference between GSB and WBM subbase in road construction
what is the salry which I am expect in kolkata for diploma in civil engineer with 3 years 6 month exp.???
what is the difference between built-up area & carpet area? how to calculate this areas?as there are any formula to calculate these areas?
Explain moment of inertia?
16. What do you consider to be your greatest achievement so far and why?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)