what is the stripping time of beam?..

Answer / jai.vignesh

As per Indian Standards:
1. Vertical form work to Beams = 16 to 24 hours
2. Props to beams Spaning up to 6.00m = 14days
3. Props to beams Spaning up to 6.00m = 21days
4. Props to be refixed immediately after
removal of form work = 7days

Is This Answer Correct ?    11 Yes 2 No

what is the stripping time of beam?..

Answer / yisahak

Generally form-work shall be stripped off after the concrete has attained 50% of the 28 day cubic strength, or when it attain twice the stress it will then be subjected after the removal of the form-work, which ever is greater.

Is This Answer Correct ?    3 Yes 0 No

what is the stripping time of beam?..

Answer / sourish

Stripline is a beam diagnostics device used to measure beam
position/phase in particle accelerators.

Is This Answer Correct ?    1 Yes 3 No

Post New Answer

More Civil Engineering Interview Questions

Unit weight of brick? Sand? Aggregate? Steel? Cement? Water?

28 Answers   Aliens Group, Cemplex, DLF, L&T, LBC, Power Trade Engineering, Vishnu, VKM,


What is the full form of APVC Pipe?

1 Answers   GSECL,


what is the density of the polythene sheet

2 Answers   NCC,


What are the specification of good quality sand for plaster and brickwork?

2 Answers  


what is meant by csr in foundation? what is sbc?what is meant by contour line?

0 Answers  






How many no of bars in a bundle of steel and kgs/bundle. 8 mm, 10mm, 12mm, 16mm, 20mm with both MS and TMT separate.

15 Answers   ABC,


Plan and schedule for 14 towers of 6 floors each with 6 flats on each floor?

1 Answers   L&T,


define the strength

0 Answers  


We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?

0 Answers  


What is tha cutting lenght off samosa ring in column 300*600.

2 Answers  


A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S

0 Answers   Vyom India,


rate analysis for cement pointing 1:4 , for 100 sq m

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)