what is M & 20 of M20 concrete
Answers were Sorted based on User's Feedback
Answer / guest
M stands for Mix
20 stands for Compressive strength of concrete in N/ mm2
| Is This Answer Correct ? | 158 Yes | 7 No |
Answer / rubes
M stands for mix, of concrete cube with a compressive
strength of 20 N/ s.mm at 28 days
| Is This Answer Correct ? | 58 Yes | 10 No |
Answer / sekar.k
M - Stands for MIX ; 20 - Stands for characteristic
compressive strength of concrete at the age of 28 days
| Is This Answer Correct ? | 42 Yes | 2 No |
M - Stands for MIX ; 20 - Stands for characteristic
compressive strength of concrete is 20 N/Sq.mm after 28
days curing.
| Is This Answer Correct ? | 20 Yes | 3 No |
Answer / guest
m stadnds for mixture and numerical value indicates is
strength after 28 days curing period
| Is This Answer Correct ? | 14 Yes | 4 No |
Answer / dinesh gaikwad
M stands for mix and 20 is its compressive strength in
n/sqmm for 28 days.
| Is This Answer Correct ? | 10 Yes | 3 No |
Answer / guest
m stadnds for mixture and numerical value indicates is
strength after 28 days curing period
| Is This Answer Correct ? | 7 Yes | 3 No |
Answer / surjit
M means mix design 28 days after curring 20n/mmsq called m20
| Is This Answer Correct ? | 6 Yes | 3 No |
Answer / sundar
charter strength of of concrete is called M20 and M25
M20 is mixing ratio is 1:1.5:3 , M25 is 1:1:2
| Is This Answer Correct ? | 9 Yes | 8 No |
HOW MANY CUBES REQUIRED FOR 7 AND 28 DAYS TEST FOR ALL MIX GRADES.
4 Answers Ansals, HFCL, Jaypee, Pratibha Group,
how much area can be platered by a mason for exterior
how much lap we should provide in columns for Fe-500?
why we do pcc.?
Q1) I am having an interview in a construction company for a large sewage project . Since I have not done any such project , there are some queries from my end. Pls. help me to solve them. I will be thankful to you :- a) Normally for large project 400-600 houses & around 1600 peoples , how much dia pipe is used and which type of pipe is used? b) For trenching , I have heard that IS 1200 implies, what are the rules of calculating earthwork in case of depth of 2m or above ? c) To prevent soil to fall when depth of trench is more , what steps are taken and how there qty. is calculated . Like I have heard about timbering . what is this ? d) What are the rules for disposing off the excavated soil ? e) How the pipes that are used are being jointed? f) In case of cleaning on choks , is there any intermediate things provided? g) For foul gases any outlets are provided thru out length of pipeline? h) What is the flow digram like from houses thru small pipe to main pipeline than where main pipeline disposes wastage ? i) Any other thing that has to be kept in mind while calculating earth work for excavation like steps are made and other things? How earthwork is calculated in case of steps ? Pls. explain with a sketch. Regards,
1:6 brick masonry cement and sand calculations
What is the meaning of a blue land surveyors flag?
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?
what is superelevation?
What is the difference between shuttering
Which types of Water Proofing to Be used in Swimming Pool.
2 Answers CCEL, Ideal Construction,
how do we calculate quantity of cement , sand and aggregates in 1 m3 of M30 grade concrete ?
31 Answers ABES Engineering College, Gammon, Jalanidhi, NCC,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)