what is M & 20 of M20 concrete
Answer Posted / surjit
M means mix design 28 days after curring 20n/mmsq called m20
| Is This Answer Correct ? | 6 Yes | 3 No |
Post New Answer View All Answers
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
What is the tallest man made structure in the world?
Formula for calculating the volume of bulb in underreamed pile
How much material is required for constructing a 2 Lane 2Km rigid pavement road
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
crank types
What are the advantages of cad software’s?
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
In earth work 1300 cum soil how to calculate how many liters require in water
How to build the floor to ceiling bookcase?
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
How many litres of water used for curing of 1000sqft of slav
How can explode a block?
How can i do RCC rate analysis?
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?