i m a btech 1st year student of civil branch.
i want to do mba in future after having some work experience
in civil field.is there any mba course made exclusively for
civil engineers?
Answers were Sorted based on User's Feedback
Answer / ns singh
Yes, definitely, yo can do your MBA in Project Management
which is related to civil engineering
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / ns singh
Yes, definitely, yo can do your MBA in Project Management
which is related to civil engineering
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / raju goyal
You can join executive course which is basically MBA program in project management and CTM from Nicmarc pune and delhi
Is This Answer Correct ? | 0 Yes | 0 No |
how many cement bags in 1m^3 cement concrete in all grade
I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??
Given a selection of 28 day cube test results for concrete placed of design mix C 35 and not all of which are greater then 35 MPa, how does one decide if the concrete in place is satisfactory. Are there a minimum number of cubes that need to be tested to decide that?
how can we find out the ratio of cement and sand in plastering
what is a civil enggineer ?
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
What are Standard weights for concete of gradeM10,M15,M20,M25,M30 Etc.
If the design mix of M-30 grade concrete is 1:1.5:2.8 (By Weight)& W/C ratio is 0.45, then what should be the volumetric mix for the same ?
Why we are using 150 mm X 150 mm X 150 mm cubes for testing the compressive strength of concrete in CTM and why not other sizes?
What is modular elasticity?
How to calculate cement quantity in m20 concrete
2 Answers nnovative Constructions, Shapoorji Pallonji Group(SPCL),
for preparing 10cum of 1:4:8 cement concrete the requirement of sand is 0.7cum 2.8cum 4.74cum 18.40cum & how