Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is the development length?

Answers were Sorted based on User's Feedback



what is the development length?..

Answer / vicky

Developement length is the length of the bar reqd to
transfer the force in the bar to the surrounding concrete
through bond.this length of embedment of bar beyond the
theoretical termination point is required so that the bar
doesnt get pulled out.

Ld = 0.87fy X dia of bar / 4 X design bond stress

Is This Answer Correct ?    20 Yes 4 No

what is the development length?..

Answer / p.maheswaran

To getting more bonding strength between reinforcement and concrete.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

What is the quantity of cement in mix m20 concrete?

0 Answers  


explain water proofing in toilets and terrace

2 Answers   L&T,


what is 43 & 53 in cement

9 Answers   Simplex,


What is the absolute pressure scale?

0 Answers  


How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)

0 Answers   Wonderla Holidays,


a simple instrument used for the measurement of colour in water is called

8 Answers  


For 12mm thick and cement plastering 1:6 on 100sqm new Brick work the quantity of cement required is

1 Answers  


tell me height of colum casting if slab height 3mtr beam thikness 500mm and slab thik 150mm please write formula sir

3 Answers   BGH, Omaxe,


In a beam tension is always at the bottom but sometimes when we design using staad we get more number of rebars at the top compression zone Why?

1 Answers  


what is difference between curtain walling and glazing and spider system which are using in building external finish systems.

2 Answers  


what is quick sand

2 Answers  


how to calculate steel columns beams and slab please give me brief calculation

14 Answers   Focus, Haven Foundation, Indian Railways, Surya Builders, VICC,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)