how to take the quantity of block work and plastering
1block price:3saudi riyal
cement:1bag:15 saudi riyal
sand:3bag:20 saudi riyal
1mason:9hour per hour 40 saudi riyal
1labour:9hour per hour 40 saudi riyal
can anybdy calculate
No Answer is Posted For this Question
Be the First to Post Answer
What is the difference between RCC & PCC?
how to draw road profile
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
Difference between P.C.C and R.C.C?
24 Answers Amit Enterprises, D Link, SAT, Surya Constructions,
How you Confirm the Hard stratum for Driven cat in situ Pile work?
which percentage is maximum in good quality cement?
HOW TO CALCULATE THE CEMENT & SAND REQUIRED FOR 1SQM BLOCKWORK OF 200MM THICK?
For what purpose bedding is used under storm water drains?
which type of materials should be used for framed structure???
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
What is the minimum depth of a slab?
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)