how to take the quantity of block work and plastering
1block price:3saudi riyal
cement:1bag:15 saudi riyal
sand:3bag:20 saudi riyal
1mason:9hour per hour 40 saudi riyal
1labour:9hour per hour 40 saudi riyal
can anybdy calculate
No Answer is Posted For this Question
Be the First to Post Answer
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
what would be compressive strength of cube for 7 days if design mix of M15
Steel Calculation for Footing, Beam & Columns?
What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)
How we decide the type of footing?
How to calculate the crank rod in slab
0 Answers Bridge and Roof, Krishna Constructions,
beam top main reinforcement(25mm) was drilled off by mistakely when making drill hole for dummy columns. any one can give useful information for this issue or related code or websites.
Please provide detail I.S standard code for using crush sand instead of river sand for plaster and concrete grade M15, M20, M25 and M30 and its mix design
how we can estimate the M50 concrete for foundation?
What is "L" provided at the base of column??
what is the size of moduler bricks
How to know proportions of cement, sand, aggregate in different types of grades like M5, M10, M20, M30?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)