how to take the quantity of block work and plastering
1block price:3saudi riyal
cement:1bag:15 saudi riyal
sand:3bag:20 saudi riyal
1mason:9hour per hour 40 saudi riyal
1labour:9hour per hour 40 saudi riyal
can anybdy calculate
No Answer is Posted For this Question
Be the First to Post Answer
indiploma civil engineering student r studied is456-1978. but in practicial we r using 2000 version i think 1978 version didn't use the student. any openion?
which type of test carrying on the cement & why
how much quantity of water is required for main wall brick work, partition wall brick work,and for internal and external plastering and how it is calculated?
1 Answers LiveCon, Sobha Developers,
why we used bricks in brickbat coba? main roll of bricks ? how it function?
3 Answers Brigade, Waskom Construction,
what is mant by point of conter of fracher(p.c.f)
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
after temping in cbr mould keep how many hours mould in water
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
Can we use the flyash bricks in brick bat coba?
1- what is steel rebar cover? 2- what is a rebar stirrup?
what is difference between GTS bench mark and temporary bench mark
what is the mix design for M45 concrete
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)