If do cube Test for 28 Days,when shall can do testing? after completion of 28 days it means 29th day or 28th day which one correct?
Answers were Sorted based on User's Feedback
Answer / cherry
we have to calculate the date that the next day of cube catsting is.29th day
| Is This Answer Correct ? | 0 Yes | 2 No |
How to replace dia of bar in beam like 25mm 3no.S at bottom But due to some reason on site 25mm bar is not available Then is it ok to provide 20mm 4no.S? Give description or Formula to calculate area of steel and replacement?
What does civil status mean?
If 600mm*200mm*150** size bricks comes 55 piece in one cubic meter then how many 230mm*115mm*75 bricks in one cubic meter
what is relation between SPT N value and driving piles after conducting a soil test?
What is the ratio of Grades M10,M15,M20,M25,M30,M35,M40.
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
what is CBR Test
best hand book for civil engineers with practical criteria
how many cement bags rquired for solid block construction for 100 sqft in 1:6 proportion?
In case of concrete cube test were all three molds are attached together do you cast your cubes simultaneously at the three molds every 50 mm or one after the other?
age of tree determine by redius of its items circumference of its stem no. of branches no. of annual rings
cement quantity in 1 M3 pcc
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)