If do cube Test for 28 Days,when shall can do testing? after completion of 28 days it means 29th day or 28th day which one correct?
Answers were Sorted based on User's Feedback
Answer / cherry
we have to calculate the date that the next day of cube catsting is.29th day
| Is This Answer Correct ? | 0 Yes | 2 No |
Why we do soil classification?
the construction of building in that primary thing is dig the soil which what depth will dig in stiff soil
What is the difference between built area and super built up area?
what is tensile strength of {6,8,10,12,16,20}mm dia bar? also there were any formula?
As per Method of measurement how to calculate no of column stirrups (ie: upto slab bottom or beam bottom)
what is the strength [final]of grade m 15 to m 45
1.0 what is the permissible westage of steel in structural steel fabrication say gantry , trustle of power plant unit 2.0 what is the permissible westage of cement in construction work as above
What is the name of this multiplication factors ?
0 Answers Engineers India Limited, L&T,
psc girder detail
Why is cover provided in beams, slabs, lintels, columns, etc ? What is the drawback of not providing cover in the same?
Explain what is Critical Path Method (C.P.M)?
what is crimping and cripling?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)