If do cube Test for 28 Days,when shall can do testing? after completion of 28 days it means 29th day or 28th day which one correct?
Answers were Sorted based on User's Feedback
Answer / cherry
we have to calculate the date that the next day of cube catsting is.29th day
| Is This Answer Correct ? | 0 Yes | 2 No |
how much quantity of tile placing can be finished by one mason per day?
What is steel requirement for one cum concrete
How to find arc area with using angle?with out using angle?
actually dia of the bar reduce asper drawing spacing also decrease that time so how to calculate the spacing of with respect to changed bar dia?
How much steel required in 1 square feet slab?
sir what is the mean of WBM
What is PQC. Means PQC
14 Answers Era Infra Engineering, L&T,
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
what is the purpose of laying PCC?
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
What is the quantit;(pratical method) of cement, sand, and gravel to be used in M25 grade of concrete for 1000 x 1000 x 1000 mm of sand (for cement please mention in kilos, and for sand and gravel please mention in cuft
what is construction joint? why do we give expancion joint in building?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)