What is the rate of earthwork excavation?
Answer Posted / abhas
120 Rs/cubic meter
| Is This Answer Correct ? | 28 Yes | 12 No |
Post New Answer View All Answers
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
What is type failure of road surface? how to repair the failure of road surface?
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
what is the formula to find the diagonal shape stirrups?
how to calculate load bearing column
The foundations are placed below ground level, to increase?
Explain different types of rcc pipes.
quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data
What are the techniques to measure road difference?
How to calculate woden area in sft and Cft
strength of bitumen concrete with 80-100 & 60-70 grade bitumen
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?
What is Gsb tollens ?