What is the rate of earthwork excavation?
Answer Posted / abhas
120 Rs/cubic meter
| Is This Answer Correct ? | 28 Yes | 12 No |
Post New Answer View All Answers
what is pqc
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
What is the meaning of a blue land surveyors flag?
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
what post do you prefer to work in this company and why do you think you can serve better in such position?
For Wet Mix Mecadam design what is Optimum moisture content
how to calibrate the RM 800
reinforcement slab, beam and column formulas?
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
what will happen if one could not properly follow the spacing of slab reinforcement bar?
what is diversion?
How do you measure water flowing through 300mm diameter pipes?
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?