What is the rate of earthwork excavation?
Answer Posted / shreedhar narayan bapat
One Labor digs 1 cubic meter earth in one day. His per day charges will be Rs.200 But If the same work is done with foklen or JCB charges will be lower hence the charges of Rs.125/- per Metercube are reasonable.
my proposal is firstly all farmers be provided with jalshiwar of 10,00,000 Ltr.i.e 1000 Cubic meter at the cost of Rs.1,25,000/- sufficient for 1acre farm
The farmer can be provided with 10,00,000 liter water at Rs.1,00,000/-
With this water The farmer shall produce rainy season crops plus rubbi crop or vegetable crops. Many farmers have earned
at least 4 lakh Rupees./acre.with less water.
suppose the necessary loan is given by local Gov.district bank.
the gross overall income of the farmer can be Rs. 400000/-
Considering that Rs.50000 is expended for organic manure and labor. and the whole amount of Rs.250000 (capital + interest ) the farmer earns Rs. 1 lakh in first year and next year at least Rs.300000/-and so on.
If gov concentrates on all rivers and deepan the rivers by one meter and provides just one meter bunds (without widening the rivers)throut the river beds for all rivers in Maharashra the water availability could be much more due
to rain collection in jalashiwvar and the rivers.By this way all the villages can be water sufficient in next yearJune 2016-May 2917,
Hence Gov.should take up the work on War Footing so that the farmers of 2 crore hector will earn Rs.20 lakh crores
inthe year 2016-17.
S.N.Bapat
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
what is the method used for marking of cantilevers in hirise buildings by using theodolite
how i convert mm into standard wire guage (SWG)no.
What materials were used to build the golden gate bridge?
How much material will consume for following specification water tank (9*7.5*6 feet)?
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
Why are pull-out tests performed for soil nails?
Define What is Civil Engineering?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
Which is stronger solid steel rod or hollow steel pipe?
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
how to find hardness of water?why it should be determined?
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?