What is the rate of earthwork excavation?
Answer Posted / vishnu
125 Rupees per Cubic meter
| Is This Answer Correct ? | 25 Yes | 11 No |
Post New Answer View All Answers
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
trapozidal
What is absolute coordinates?
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.
Which IS Code/American Code applied for coupler test of steel
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
What is .Dwg?
How can I make justification between using concrete grade c35 compare c37?
how calculate the bearing from two coordinates?
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
What is an object snap mode?
what is stressing
How can i do RCC rate analysis?
how to do sudoko puzaals?