How much cement ,steel bar, concrete ,required for 416 cum rcc slab
Answer / sharan kavaloor
slab concrete
325kg/m3 2704 cement bags
steel bar : 49.92 MT
Coarse Aggregate (M20mm down): 405.90 m3
Fine Aggregate:320m3
| Is This Answer Correct ? | 0 Yes | 0 No |
Why do you want to work here
1)What is the total volume of aggregates required for 1cu.mtr.solid hard concrete? 2)What is total mass of wet concrte and dry concrete after 28 days of M25? 3) Is 28 days strength is the final strength of concrete or it gets increasing as the time period increses.? 4)What is the volumetric proportion of concrete grade of M25.M30,M35,M40
What is the difference between shuttering
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??
Mujhe koi ye bta do ki 1.54 hi ku lete h material ki quantity niklne ke liye Sab jgha dhund liya bt samj nhi aaya mujhe koi alag aalag krke smjao ki cement m aggr. Dust m itne % wet or dry % hoti h fir kaise kaise 1.54 aaya kha se aaya smjao koi pls m confuse hu my calling nd wts app no. Is +919034604938
what is quick sand
calculation of cement bags in 1:2:4 concrete mix
what is the main disadvantage of concrete at environmental point of view.
Sir your company in receiver ment of civil engineering.
Explain the difference between shear and tensile strength.
How can we cross check the excavation and backfilling quantities.
How to calculate volume of dry mix concrete?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)