what will do when 7days concrete has failed and structure has
constructed?
Answer Posted / amilineni s babu
we have to wait for 28 days strength if it is also less we
have to go for core cutting or rebound hammer tests for that
particular structure part.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How long does it take concrete to harden?
WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10
How do you measure water flowing through 300mm diameter pipes?
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
what is the coefficient for running feet to cft coversion both area and price
Cement consumption of one cubic meter of aerocon blocks masonry?
What is Gsb tollens ?
How to hide dimensions in autocad?
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
Would you cause a 55-gallon drum of water to weigh more by climbing in?
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,
How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....
Which architectural movement is also known as jazz moderna?
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?