what will do when 7days concrete has failed and structure has
constructed?

Answer Posted / amilineni s babu

we have to wait for 28 days strength if it is also less we
have to go for core cutting or rebound hammer tests for that
particular structure part.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the procedure of concealed plumbing in toilets?

1896


What things you need to take care of before building a kitchen island?

737


how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?

1541


mean of NH4 pipe

2119


in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft

1511






How to calculate chejja reinforcement

1902


Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in

1604


load combinations how many types for staad design purpose?

1735


how to take the quantity of block work and plastering  1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate

2050


Define mirror?

806


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2396


what is diffrence between catchment area,watershed and basin?

2502


Why should pumping be not used in case of concreting work?

897


Formula of area of crane hook

1527


can i get hindi version of is codes based on civil engineering?

3889