what will do when 7days concrete has failed and structure has
constructed?
Answer Posted / modipraveen
Hi,
Generally we will wait for 28th day test, If structure is
failure, then will intimate to Structural Consultant to
strengthen the structure.
| Is This Answer Correct ? | 19 Yes | 1 No |
Post New Answer View All Answers
What is the sugested procedure of water purification for public supply?
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
calculate the quantity of water for 1:6 cement mortar
how u design STAGING for Superstructure in BRIDGE construction?
how we calculate the grade of the Bituminous materials.?????
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
how is the reinforcement is distributed in triangular slab
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
How we calculate the service time of buildings
Define What is the difference between routing maintenance and major maintenance in school facilities?
How much 1 cum of M15, M20 & M25 concrete weigh?
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
how many shuttering material required for 1000 sq.m built up area.
how find the cut length of tringular ring and any formula find out the quantity of circular brick work