what will do when 7days concrete has failed and structure has
constructed?

Answer Posted / modipraveen

Hi,
Generally we will wait for 28th day test, If structure is
failure, then will intimate to Structural Consultant to
strengthen the structure.

Is This Answer Correct ?    19 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?

4876


how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high

1441


HOw much % of premium on DSR-2013 currently

1546


Explain the advantages and disadvantages of using plastic and timber fenders?

723


What is geopolymer based concrete?

2158






How do you compute volume of airflow?

693


How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir

1041


what is differences between ferrock and concrete ?

1435


how can calculate the compressive strength of concrete cylinder by water cement ratio ?

1237


How can you distinguish between sorption, absorption and adsorption?

754


a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer

2031


what is diversion?

1753


How much 1 cum of M15, M20 & M25 concrete weigh?

702


what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/

1822


why +1 to be followed for calculating the no of bars in BBS. Please explain

1521