what will do when 7days concrete has failed and structure has
constructed?
Answer Posted / modipraveen
Hi,
Generally we will wait for 28th day test, If structure is
failure, then will intimate to Structural Consultant to
strengthen the structure.
| Is This Answer Correct ? | 19 Yes | 1 No |
Post New Answer View All Answers
What is type failure of road surface? how to repair the failure of road surface?
types of laps in column
What is geopolymer based concrete?
what are the ffactors you considered choosing the course?
can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?
Explain moment of inertia and its importance.
Explain what are the problems one might face while having a Cantilever balcony?
Which type of plywood & sizes using in construction projects ?
What is the minimum size of the particles of silt soil?
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.