what will do when 7days concrete has failed and structure has
constructed?
Answer Posted / modipraveen
Hi,
Generally we will wait for 28th day test, If structure is
failure, then will intimate to Structural Consultant to
strengthen the structure.
| Is This Answer Correct ? | 19 Yes | 1 No |
Post New Answer View All Answers
What is Refuse Area In High Rise Building ?
How to calculate steel for beam slab and column
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
How much cement is require in one sqft area in a G+3 residential construction.
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
Define mirror?
why we use aggregate,sand with cement in concrete?
How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?
What is meant by solid geometry?
Bernaullis theorem deals with the law of conservation of mass momentum energy none
Does VDF add strength to the flooring apart from preventing water ingress?
Volume of 25kg putty bag & 40 kg putty bag volume??