what will do when 7days concrete has failed and structure has
constructed?
Answer Posted / suresh bariya
Generally we will wait for 28th day test,if 28 days test
result get failed then immidiate inform your structural
consultant,consultant will suggest the rebound hammer test
which is not a perfect solution, then do the core cutting
test it will give you the actual result of that strucutural
concrete, from this result you will know the actual
strength ,it will decide the jacketing will serve the
purpose or brecking is the final solution.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
Why was the empire state building made of steel?
Define block?
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
construction workers how much time take one work or qty
How many pyramid in egypt?
Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish
What is difference between combin footing & rapt footing
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
what is idealized curve for concrere and steel
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
what is m30 in concrete tiles
What are the common ways of demolition?
where can i get the previous question papers for rrb section enginerr (civil)