how to calculate concrete quantity for footing using M25 grade
1:1:2 for 730cft.

Answers were Sorted based on User's Feedback



how to calculate concrete quantity for footing using M25 grade 1:1:2 for 730cft...

Answer / kuldeep singh sevariya

dry quantity of 1 cum wet concrete =1.54
730cft=20.67cum of wet quentity
so,dry quentity of 20.67cum=1.54*20.67=31.83cum

CEMENT=(31.83*1)/(1+1+2)=7.96cum
(Density of cement-1440kg/cum)
(7.96*1440)/50=229.176Bags

SAND=(31.83*1)/4=7.92CUM, SO, 1600*7.92=12672 KG

AGGREGATE=(31.83*2)/4=15.92 CUM
SO,1520*15.92=24198.4 KG

Is This Answer Correct ?    14 Yes 3 No

how to calculate concrete quantity for footing using M25 grade 1:1:2 for 730cft...

Answer / mohammed aijaz hussain

Volume of Wet concrete = 730 cu.ft. = 20.68 cu.m.

Volume of Dry concrete = 1.75 X 20.68 = 36.19 cu.m.

Volume of cement = 1/4 X 36.19 = 9.048 cu.m.
= 258.5 Bags

Volume of Sand = 1/4 X 36.19 = 9.048 cu.m.

Volume of Aggregate = 2/4 X 36.19 = 18.095 cu.m.

Is This Answer Correct ?    5 Yes 2 No

how to calculate concrete quantity for footing using M25 grade 1:1:2 for 730cft...

Answer / ramakrishna

cement-232 bags
sand-12.9tons
metal-570cft

Is This Answer Correct ?    3 Yes 3 No

Post New Answer

More Civil Engineering Interview Questions

what are the standard & nominal size of brick

8 Answers  


What is specific gravity & how it is calculated

2 Answers  


What is the maximum strength of cub compress strength in one cub testing

0 Answers   Zandu Enterprises,


what discoveries did you have in relation to your course?

0 Answers  


could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!

0 Answers  






how much quantity of cement(bags)concrete(20mm)and sand(sqft)is used in 1:3:6 PCC

6 Answers  


In earth work 1300 cum soil how to calculate how many liters require in water

0 Answers   L&T,


I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations

0 Answers  


1)What is swear, swage and storm water? 2)What are the sizes of bricks based on Nominal, practical and standard? 3) What is the distinguies between the grade of cement 43, 53?

4 Answers   L&T,


Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quantity of concrete by explaining all formulas involved.

16 Answers   Reliance, Siddhi Constructions,


how to take concrete quantity for precast segment for viaduct project?

0 Answers  


what means if slump is less than 25mm and greater than 80mm?

7 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)