how to calculate concrete quantity for footing using M25 grade
1:1:2 for 730cft.

Answer Posted / kuldeep singh sevariya

dry quantity of 1 cum wet concrete =1.54
730cft=20.67cum of wet quentity
so,dry quentity of 20.67cum=1.54*20.67=31.83cum

CEMENT=(31.83*1)/(1+1+2)=7.96cum
(Density of cement-1440kg/cum)
(7.96*1440)/50=229.176Bags

SAND=(31.83*1)/4=7.92CUM, SO, 1600*7.92=12672 KG

AGGREGATE=(31.83*2)/4=15.92 CUM
SO,1520*15.92=24198.4 KG

Is This Answer Correct ?    14 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to calculate freeboard in under ground water tank and technical details

2683


dialation means

1844


How will drive weight formula for circular cylinder steel bar in kg/ m please step by step drive?

1781


What glue is least sticky?

691


how much tempareture are required to make liquid state of pid leed

1713






B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS

2541


what is the water-cement ratio of mix design while 30mpa in 7 days?

2633


What is bylayer?

684


kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com

1404


Bernaullis theorem deals with the law of conservation of mass momentum energy none

1585


how can calculate the compressive strength of concrete cylinder by water cement ratio ?

1235


how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm

1546


What is meaning of FREE STANDING STAIRCASE ?

2501


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1677


use ofr concrete as per grade ?

1643