Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to calculate concrete quantity for footing using M25 grade
1:1:2 for 730cft.

Answer Posted / kuldeep singh sevariya

dry quantity of 1 cum wet concrete =1.54
730cft=20.67cum of wet quentity
so,dry quentity of 20.67cum=1.54*20.67=31.83cum

CEMENT=(31.83*1)/(1+1+2)=7.96cum
(Density of cement-1440kg/cum)
(7.96*1440)/50=229.176Bags

SAND=(31.83*1)/4=7.92CUM, SO, 1600*7.92=12672 KG

AGGREGATE=(31.83*2)/4=15.92 CUM
SO,1520*15.92=24198.4 KG

Is This Answer Correct ?    14 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2138


How to calculate construction cost of residential building in mumbai

2083


IS code for grade of concrete for bamboo lintel????

2217


What is Gsb tollens ?

2042


What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?

1568


Why are pull-out tests performed for soil nails?

1230


How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me

2038


why are you joining in this (applied post) job and your aim for this job

2711


how to calculate reinforcment in staircase cranked beam?

2912


why building got air crack? if it get in one particular are what is means?

2515


What is OSHA compliance?

1203


As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

1995


how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building

2907


.5Ast

1844


What applicable rate of wct in bihar

1886