Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to calculate concrete quantity for footing using M25 grade
1:1:2 for 730cft.

Answer Posted / mohammed aijaz hussain

Volume of Wet concrete = 730 cu.ft. = 20.68 cu.m.

Volume of Dry concrete = 1.75 X 20.68 = 36.19 cu.m.

Volume of cement = 1/4 X 36.19 = 9.048 cu.m.
= 258.5 Bags

Volume of Sand = 1/4 X 36.19 = 9.048 cu.m.

Volume of Aggregate = 2/4 X 36.19 = 18.095 cu.m.

Is This Answer Correct ?    5 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

For Wet Mix Mecadam design what is Optimum moisture content

2037


What is reinforced concrete?

1106


In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?

2082


What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)

2109


Explain the importance of moment of inertia?

1257


In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?

1064


how can i calculate cement in brickwork

3929


In reclamation works what are the importance of geotextiles and sand?

1140


Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No.       Loading        Axial force      Moment     Shear 1               DL+LL          1950              600            20 2           Seismic load       250              4800          700

1978


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

2137


Curing time for 1)R.C.C slab 2)B.W 3)Plastering

2069


Explain what is the difference between built area and super built up area?

1186


How do you determine specific gravity of cement?

1113


The concrete slump recommended for beams and slabs; is?

1259


how can we calculate steel value, depending on load

2304