how to calculate concrete quantity for footing using M25 grade
1:1:2 for 730cft.
Answer Posted / mohammed aijaz hussain
Volume of Wet concrete = 730 cu.ft. = 20.68 cu.m.
Volume of Dry concrete = 1.75 X 20.68 = 36.19 cu.m.
Volume of cement = 1/4 X 36.19 = 9.048 cu.m.
= 258.5 Bags
Volume of Sand = 1/4 X 36.19 = 9.048 cu.m.
Volume of Aggregate = 2/4 X 36.19 = 18.095 cu.m.
| Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
how many time use of plywood shuttering and IS code
Why does the pressure increase under soil?
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete
There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
What are the uses of alloys in daily life and how are alloys made?
VAT and CST ? Which benefits for buyer ? Why benefits?
how is the reinforcement is distributed in triangular slab
What is gravity flow?
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
What is meant by engineering drawing?
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
Explain the design for rcc multi-storied building?