how to calculate concrete quantity for footing using M25 grade
1:1:2 for 730cft.

Answer Posted / ramakrishna

cement-232 bags
sand-12.9tons
metal-570cft

Is This Answer Correct ?    3 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.

1217


How many square meter can a worker/labor demolish a structure per day?

1526


For what building Built-on balconies are preferable? What are the advantages?

724


What is the Hardness of M-40 grade concrete, general and theoratical

1669


how many BSCs can i connect to the HUAWEI MSC

1842






what is the hanekom repairing material after concreting work

1925


What is OSHA compliance?

694


what is Quantity of stone and sand required for one cubic meter of stone work (UCR)

1642


Explain major difference between auto level and dumpy level?

750


Explain the importance of moment of inertia?

769


How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me

1464


Define relative co-ordinates?

697


who to find building iron rod strenth

1583


What is chemical composion test

1511


Will water damage concrete?

772