how to calculate concrete quantity for footing using M25 grade
1:1:2 for 730cft.
Answer Posted / ramakrishna
cement-232 bags
sand-12.9tons
metal-570cft
Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
How many square meter can a worker/labor demolish a structure per day?
For what building Built-on balconies are preferable? What are the advantages?
What is the Hardness of M-40 grade concrete, general and theoratical
how many BSCs can i connect to the HUAWEI MSC
what is the hanekom repairing material after concreting work
What is OSHA compliance?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
Explain major difference between auto level and dumpy level?
Explain the importance of moment of inertia?
How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me
Define relative co-ordinates?
who to find building iron rod strenth
What is chemical composion test
Will water damage concrete?