Whether dry volume or wet volume of concrete more but why?
Answer / tarique aziz
Obviously dry volume is more
We take 1.54- 1.57as dry volume for 1 m3 of wet mortar.
| Is This Answer Correct ? | 0 Yes | 0 No |
What is different type of bills?
what is levelling staff least count
shear stress where is max.min in beams?
pls give the grads of concrete and the ratios to the same
what energized you to complete your course?
What is the purpose of Chipping in the heavy foundation?
What is the basis of choice for cement sand plaster in ratio 1:4 and 1:6 on interior walls of a residential apartment.
how to know 28 day strength of concrete knowing 3 day or 7day strength of concrete???
What is logic behind the use of Steel bar insted of gold bar?
Permissible wastage of cement as per IS code ? In which IS code I get it?
how much of the strength comes from post-production curing
why do we provide haunches in rcc box or underpasses?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)