Whether dry volume or wet volume of concrete more but why?
Answer / tarique aziz
Obviously dry volume is more
We take 1.54- 1.57as dry volume for 1 m3 of wet mortar.
| Is This Answer Correct ? | 0 Yes | 0 No |
As per thumb rule cement required per 1 cum of M20 concrete is 411Kg/cum(1.57/5.5=0.285cum of cement i.e 0.285*1440=411Kg).But as per PWD rate analysis cement required is 347Kg/cum.the difference is 64Kg.This kind of difference is coming every grade of concrete.Can you give perfect suggestion regarding this.
what is polity
What are the different types of foundation?
1M2=how much M3?
what will be the weigth of 50 kg/sq cm and 30 kg/sq cm compressive strength solid concrete block of 200 mm ?
How the reconcilation of the steel can be done?
3 Answers IL, JMC, JMC Projects, Simplex,
how much thick Pcc required for floor tiles
Sir your company in receiver ment of civil engineering.
Geometric Design Related Code name in India.
In Earth work compaction How u calculate How many liters of water required,for compaction of ordinary soil for one Cu.m.
What are the precautions needs during concrete pouring in very hot weather?
How is make concrete cube?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)